Kora Founders Edition Install 3.7 | Connecting Powerblocks to the Smart Panel

Wire each Powerblocks hybrid inverter to the Smart Panel.

1 min read

Wire each Powerblocks hybrid inverter to the Smart Panel. Run L1, L2, neutral and ground from the inverter's wiring compartment to the tower's breaker position on the Smart Panel.

Land the conductors with the breaker open, and don't add neutral-ground bonds in the Powerblocks or in a combiner box.

Key steps

  • Open the hybrid inverter's wiring cover
  • Route L1, L2, neutral and ground to the Smart Panel
  • Land the conductors with the breaker open

Part of the Kora Smart Panel installation series for licensed electricians installing the Kora Founders Edition. Previous: 3.6 Powerblocks Breaker Layout. Next: 3.8 Powerblocks Communications Daisy Chain.

From the manual

The matching pages from the Kora Smart Panel & Powerblocks Installation Manual. Always follow the manual and local code.

  • Kora installation manual page 78: 11.3 Single-Tower Connection
    Manual p. 78 – 11.3 Single-Tower Connection

Keep reading

View all

Kora Founders Edition Install 1.1 | Smart Panel Clearances and Location

Kora Founders Edition Install 1.1 | Smart Panel Clearances and Location

Plan where the Kora Smart Panel goes and confirm the working clearances before anything goes on the wall.

Read more

Kora Founders Edition Install 1.2 | Kill the Power: Lockout/Tagout

Kora Founders Edition Install 1.2 | Kill the Power: Lockout/Tagout

Shut off the service and make the work area safe before you touch a single wire.

Read more

Kora Founders Edition Install 1.3 | Surface Mount vs. Flush Mount

Kora Founders Edition Install 1.3 | Surface Mount vs. Flush Mount

Choose between surface mounting the Kora Smart Panel and flush mounting it into the wall.

Read more