Next up are your conductors: cut and strip them, then land the mains in the Smart Panel's high-voltage zone. Do this only with every source locked out and verified dead.
The Smart Panel keeps high-voltage and low-voltage wiring in separate zones. Wire the source section first and keep the standard color convention so the next person can read the panel at a glance.
Key steps
- Cut and strip conductors to the specified length
- Land the mains in the high-voltage zone
- Black for L1, red for L2, gray for neutral, green for equipment ground
Part of the Kora Smart Panel installation series for licensed electricians installing the Kora Founders Edition. Previous: 1.6 Set and Level the Main Assembly. Next: 1.8 Conductor Prep and Isolating Every Source.